fab_01

a pre(fab)ricated solution designed by

Feldman Architecture

in honor of & in response to

Altadena

& in partnership with

Blend Projects

A High Performance, Passive House Certifiable rebuild solution that harmonizes architectural integrity & systemized delivery.

fab_01 represents our commitment to deliver an elevated, thoughtful, resilient design to families ready for an efficient, price conscious solution.

The Origin

Blend Projects and Feldman Architecture first met when collaborating on a custom residence in Carmel Valley, pairing Feldman's site-sensitive design with Blend's off-site building system. Months later, the Eaton and Palisades fires devastated Altadena and the Pacific Palisades, destroying more than 16,000 homes.

What had begun as a single custom build became a larger question: could this partnership provide a solution for displaced families in search of a path to a design forward home, without the yeasr and unpredictable costs of a conventional rebuild?

fab_01 is the answer.

Designed for Altadena, now available across Canada & the United States.

Award Winner

Recognized in the 2025 Passive House Network California Rebuilds Design Competition, Contemporary category

Pre-Approved

Standard plan #27063 for fire rebuilds in LA County,

Up to 50% Faster

10 - 18 months from design kickoff compared to
2.5 - 4 years for traditional custom builds

The Design

Architect-led. Intentionally detailed. Ready to build.

Size

2,615 sqft total
2,155 sqft + 460 sqft garage

Bedrooms

3

Bathrooms

3

The System

Off-site precision. On-site speed.

fab_01 is built using Blend's structural prefab system:

+ Structurally insulated wall & roof panels (SIPs)
+ Mass timber moment frames

Components are manufactured off-site and delivered ready to assemble.

This system eliminates on-site construction waste by up to 60%
compared to traditional construction methods.

fab_01 is built using Blend's structural prefab system:

Structurally insulated wall & roof panels (SIPs)
Mass timber moment frames

Components are manufactured off-site and delivered ready to assemble.

Eliminates on-site construction waste by up to 60%
compared to traditional construction methods

The Team

Feldman Architecture and Blend Projects are available and experienced with consultant coordination, and are already working in partnership with the following teams:

LA-based TERREMOTO, experts in native garden-making and landscaping that regenerates fire affected sites, looks forward to offering custom design concepts for specific site, lots, and clients.

Modulus Designs, a structural engineering firm specializing in high-end residential projects, will provide engineering solutions for fab_01.  

 

The Timeline

Up to 50% faster than traditional construction

Phase

Traditional Custom

Fab_01 with Blend

Fab_01 w Blend

Design

4-8 Months

1 Month

Documentation

3-6 Months

1-2 Months

Permitting

6-12 Months

2-3 Months

Construction

18-24 Months

6-8 Months

Total

2.5-4 Years

10-18 Months

Feasibility Study & Cost

Let's Talk Numbers

fab_01 begins with a feasibility study based on your specific lot, site conditions, and local contractor pricing – providing a transparent budget based on your unique build.

The cost to build this pre-approved model in LA county is approximately

$XXXX/sqft

Costs can vary significantly, which is why a feasibility study is required prior to construction.

Ready to rebuild - or build
something new?

fab_01 is available for projects across the US and Canada.
Whether you're rebuilding or starting fresh, Blend is ready to guide you through every step.

Stay up to date

© Blend Projects 2026

Stay up to date

© Blend Projects 2026