fab_01

a pre(fab)ricated solution designed by

Feldman Architecture

in honor of & in response to

Altadena

& in partnership with

Blend Projects

A High Performance, Passive House Certifiable rebuild solution that harmonizes architectural integrity & systemized delivery.

fab_01 represents our commitment to deliver an elevated, thoughtful, resilient design to families ready for an efficient, price-conscious solution.

The Origin

Blend Projects and Feldman Architecture first met when collaborating on a custom residence in Carmel Valley, pairing Feldman's site-sensitive design with Blend's off-site building system. Months later, the Eaton and Palisades fires devastated Altadena and the Pacific Palisades, destroying more than 16,000 homes.

What had begun as a single custom build became a larger question: could this partnership provide a solution for displaced families in search of a path to a design forward home, without the years and unpredictable costs of a conventional rebuild?

fab_01 is the answer.

Designed for Altadena, now available across Canada & the United States.

Award Winner

Recognized in the 2025 Passive House Network California Rebuilds Design Competition, Contemporary category

Pre-Approved

Standard plan #27063 for fire rebuilds in LA County,

Up to 50% Faster

10 - 18 months from design kickoff compared to
2.5 - 4 years for traditional custom builds

The Design

Architect-led. Intentionally detailed. Ready to build.

Size

2,615 sqft total
2,155 sqft + 460 sqft garage

Bedrooms

3

Bathrooms

3

The System

Off-site precision. On-site speed.

fab_01 is built using Blend's structural prefab system:

+ Structurally insulated wall & roof panels (SIPs)
+ Mass timber moment frames

Components are manufactured off-site and delivered ready to assemble.

This system eliminates on-site construction waste by up to 60%
compared to traditional construction methods.

fab_01 is built using Blend's structural prefab system:

Structurally insulated wall & roof panels (SIPs)
Mass timber moment frames

Components are manufactured off-site and delivered ready to assemble.

Eliminates on-site construction waste by up to 60%
compared to traditional construction methods

The Team

Feldman Architecture and Blend Projects are available and experienced with consultant coordination, and are already working in partnership with the following teams:

LA-based TERREMOTO, experts in native garden-making and landscaping that regenerates fire affected sites, looks forward to offering custom design concepts for specific site, lots, and clients.

Modulus Designs, a structural engineering firm specializing in high-end residential projects, will provide engineering solutions for fab_01.  

 

The Timeline

Up to 50% faster than traditional construction

Phase

Traditional Custom

Fab_01 with Blend

Fab_01 w Blend

Design

4-8 Months

1 Month

Documentation

3-6 Months

1-2 Months

Permitting

6-12 Months

2-3 Months

Construction

18-24 Months

6-8 Months

Total

2.5-4 Years

10-18 Months

Let's Talk Numbers

Feasibility Study & Cost

fab_01 begins with a feasibility study based on your specific lot, site conditions, and local contractor pricing – providing a transparent budget based on your unique build.

The cost to build this pre-approved model in LA county is approximately

$650-$850/sqft

Costs can vary significantly, which is why a feasibility study is required prior to construction.

Ready to rebuild - or build
something new?

fab_01 is available for projects across the US and Canada.
Whether you're rebuilding or starting fresh, Blend is ready to guide you through every step.

Newsletter Sign Up

© Blend Projects 2026

Newsletter Sign Up

© Blend Projects 2026