The Pre-Purchase Playbook
9 questions to ask before you buy land to build on.
Things the Blend team has learned over decades of experience that your realtor probably won’t tell you.

Building on land you’ve chosen is one of the most rewarding things a family can do. The people who get it right aren’t lucky. They just knew what to ask before they signed.
This guide hands you those questions. Use it before you make an offer on any piece of raw land.
How will you actually use the space?
Define your must-haves before you fall for the view.
A stunning view is easy to fall for. But a view and a life are two different things. Before you visit a single showing, get clear on how your household actually uses outdoor space. A dramatic sloped lot with an unbelievable panorama might mean every outdoor space is a deck with no lawn, no garden and no safe play area. That’s not a flaw in the land. It’s a mismatch.

What will it cost to make this lot buildable?
Ask a contractor to review the site.
Site prep is the cost that surprises buyers most. Before your build can even begin, you may need to clear trees, build a driveway, bring in power, connect to water and sort out sewage. Most buyers estimate around $50,000. On a rural or waterfront property without services stubbed in, that work typically runs $150,000 to $200,000.
- Existing utilities, such as water and power.
- Tree density, and how many trees must come out for the footprint and driveway.
- Significant topography that will need levelling.

Where does the sun land?
Check the sun path at different times of day.
A showing at 3pm in July might be the one golden window of afternoon light that lot ever gets. Before you visit, check the sun path with an app like SunSurveyor or Sun Seeker. A north-facing slope might be gorgeous in afternoon light and deeply shadowed every morning for six months of the year. The best lots get consistent light on the areas where you’ll actually spend time.

How far are trades and suppliers from the site?
Factor the location premium into your total build budget.
Remote is beautiful. Remote also costs significantly more to build on. The further your property is from a hub of contractors and suppliers, the more every trade charges to show up. On remote waterfront sites we’ve built on, ferry and road time alone has added 15–20% to total trade costs. A property that looks like strong value at purchase can quietly become the most expensive build you’ve ever done once the full project cost is tallied.
- Travel distance for trades and suppliers adds delivery and travel costs.
- Accommodation and other live-out expenses can add up to $50,000 to a project budget.
- Shipping fees are rarely budgeted early and can add up to $25,000, depending on location.

What’s coming for the land around you?
One afternoon at municipal hall can answer it.
The lot you’re buying comes with neighbours, and neighbours have plans: a development permit on the hillside across the water, a subdivision going in beside the quiet forest. These things are in the public record, but most buyers never look.

What are the seasonal and maintenance realities?
Talk to a local builder about all four seasons.
A steep driveway in the Pacific Northwest is a drainage challenge, a runoff problem in heavy rain, and a real question about winter access. Snow load in mountain country affects foundation depth and structural requirements. The local climate interacts with your lot in ways that aren’t obvious on a sunny August afternoon. Talk to a builder or architect with regional experience before you commit.

What property documentation is available?
Know your building limits before you bid.
Find out what documents exist, and what you’ll need, to understand the building limits, covenants and site plan. They’ll shape the design and build, and give you a much clearer picture of real-world costs.
- Will geotechnical engineering be needed? Is the topography complex or the soil potentially unstable?
- Is there an existing survey with enough detail for design? It can save money and let design move quickly.
- Are there any covenants or easements on the property?

Have you talked to a construction lender yet?
Understand your financing before you make an offer.
Carrying costs on raw land start the day you take possession, not the day you move in. Property tax, service connection fees and development cost charges don’t wait. What most buyers don’t know: buying land in cash doesn’t automatically strengthen your position with a lender, and in some cases it can limit your options. Have this conversation before your offer, not after.

Final thoughts
None of these are reasons to walk away from the land you love. This guide isn’t here to dampen that excitement. It’s here to protect it. The people with the best outcomes aren’t the ones who found the perfect lot. They’re the ones who asked the right questions before they signed.
Common questions about buying land to build on
How much does site prep cost on raw land?
Most buyers budget around $50,000. On rural or waterfront lots without services, clearing, driveway, power, water and septic typically run $150,000 to $200,000.
Should I get a geotechnical report before buying land?
If there’s slope, wet areas, rock or signs of unstable soil, yes. Ask the seller if one exists. If not, make one a condition of closing.
Does building on a remote lot cost more?
Yes. On remote waterfront sites, ferry and road time alone has added 15–20% to trade costs, plus accommodation and shipping.
Can I get a construction loan if I buy the land in cash?
Possibly, but paying cash doesn’t automatically help and can limit your options. Talk to a construction lender before you make an offer.
What is CMHC Prefab Plus?
A CMHC mortgage insurance product for factory-built and panelized homes in Canada. Ask your lender if you qualify.
Let’s build together.
Have a site in mind for a future Blend home? Book a Discovery Call and we’ll help you look at it with fresh eyes.
